Dark Light
, , , ,

EVM 512GB 2.5-Inch SATA 3D TLC NAND Flash Fast Performance Internal SSD ( EVM25/512GB )

EVM

EVM 512GB 2.5-Inch SATA 3D TLC NAND Flash Fast Performance Internal SSD ( EVM25/512GB )

(1) Capacity 512GB
(2) Package Dimension 100mmx69.9mmx7mm
(3) Weight 39gm
(4) Part Number EVM25/512GB
(5) Life expectancy of 1 million hours MTBF
(6) Form Factor 2.5 Inch SATA
(7) Interface SATA 3.0 Gb/s SATA 6.0 Gb/s

₹5,475.00

Compare

EVM 512GB 2.5-Inch SATA 3D TLC NAND Flash Fast Performance Internal SSD ( EVM25/512GB )

  • Designed for mainstream PCs and laptops for personal, gaming and business use
  • Advanced Drive Management through Software to help you manage the drive. User-friendly tools help keep your drives up to date, monitor drive health and speed and even boost performance.
  • Upgrade to affordable SSD performance with next-gen 3D NAND.
  • Leverage a SATA SSD that provides up to 30× faster speeds than hard drives.
  • Easily upgrade with a 2.5x7mm form factor and SATA connection that allows for universal swap out of SATA drives
  • Remarkable transfer speeds that enable faster bootup and improved overall system performance. The advanced SLC Cache Technology allows performance boost and longer lifespan
  • Improves battery life because it’s 45 times more energy-efficient than a typical hard drive
  • Fast start-up, loading and file transfers
SKU: EVM25-512GB Categories: , , , , Brand:
Brand

Ssd Capacity

Form Factor

2.5 Inch

Ssd Interface

Heatsink

Color

Product Payment

Call For Availability

Based on 0 reviews

0.0 overall
0
0
0
0
0

Be the first to review “EVM 512GB 2.5-Inch SATA 3D TLC NAND Flash Fast Performance Internal SSD ( EVM25/512GB )”

There are no reviews yet.