Desktop Components, EVM, RAM
EVM 4GB DDR3 1333MHz CL11 Laptop Ram ( EVMT4G1333S86P 4GB )
EVM 4GB DDR3 1333MHz CL11 Laptop Ram ( EVMT4G1333S86P 4GB )
(1) Capacity 4GB
(2) DRAM Type DDR3
(3) Form Factory DDR3 SoDimm
(4) Part Number EVMT4G1333S86P
(5) Chip Density 256Mx8 8 Chips / 256Mx8 16 Chips / 256Mx16 4Chips /
256Mx 16 8 Chips / 512Mx8 8Chips/ 512Mx8 16Chips
(6) Frequency (speed) 1333MHz
(7) Bandwidth Pc3 10600
(8) CAS Latency 11.0/9.0/7.0
(9) Operating Temperature 0*C to 85*C
(10) Storage Temperture -55*C to + 100*C
(11) Voltage 1.5 Voltage
(12) Pins 204-PIN
(13) Warranty 10 Years Warranty
₹990.00
Compare| Brand | |
|---|---|
| Ram Type | |
| Ram Memory Type | DDR3 |
| Ram Memory Size | 4GB |
| Ram Kit Type | 4GB x 1 |
| Ram Speed | |
| Ram Cas Latency | |
| Heatsink | |
| Color | |
| Product Payment | |
| Call For Availability |














There are no reviews yet.